Skip to content

From the first call to teardown.

One project manager plans your network with you. One engineer runs it in the hall. Here’s what happens in between.

The process

  1. 1.First call

    Tell us the show, the venue, your booth size, and what you'll be plugging in. A rough list is fine. A project manager is assigned to your event on that call and stays your contact until the gear is packed out.

  2. 2.Planning

    Your project manager works through the details with you: how many devices, which ones need to be wired, what needs to be kept apart, and what the venue's rules allow. If you're working with a booth builder or an agency, we coordinate with them directly.

  3. 3.Estimate

    You get an itemized estimate: the venue circuit at the venue's current rate, the equipment we'll deploy, and on-site engineering for the hours you want covered. Nothing is ordered until you approve it.

  4. 4.Ordering

    We place the circuit order with the venue's provider ahead of the advance-pricing deadline, so you aren't paying the late rate.

  5. 5.Build

    Your network is configured and tested in our shop before it travels. Cables are cut to length and labeled for your booth layout.

  6. 6.Move-in

    Our engineer sets up during move-in, alongside your booth crew. Before doors open, we walk your staff through the setup and test every connection with them.

  7. 7.Show days

    An engineer is on-site for the hours on your estimate. If something drops, they're in the hall and can be at your booth in minutes.

  8. 8.Teardown

    We pack out on the venue's schedule. Your booth crew doesn't touch our gear.

Who does what

The venue’s providerBridge10You
Internet circuitDelivers it to your boothSpecs it and places the orderApproves the estimate
EquipmentSupplies the dropBrings, configures, and tests everything behind itNothing
WirelessSets the rules for what's allowedTells you what's possible and sets it up accordinglyNothing
CoordinationAnswers to whoever orderedTalks to the venue, your booth builder, and the show contractorTalks to your project manager
During the showHelp desk for the buildingEngineer on-site for your boothRuns your booth

Questions people ask

Are you allowed to do this at the venue?
Yes. We order through the venue's own provider and follow its rules. We don't bring anything into the hall that the venue prohibits.
How far ahead should I contact you?
Earlier is better. Venues charge less for orders placed well before move-in, and a few weeks of lead time gives us room to plan properly. If your show is close, call anyway; we'll tell you what's still possible.
What does it cost?
It depends on the circuit your setup needs, the equipment, and how many hours you want an engineer on-site. Every client gets the same level of service; the estimate reflects the size of the job. You'll see every line before you approve.
Can I have wireless in my booth?
It depends on the venue and the circuit. Some venues allow booth wireless on certain connections; others require you to use theirs. We check before anything is ordered and set it up whichever way the venue allows.
What happens if the venue's internet goes down?
Our engineer works the problem with the venue's provider from the floor, so you aren't waiting on a help desk ticket. If your show can't tolerate any downtime, we'll plan a backup with you before the show.
Do you work at venues outside Las Vegas and New Orleans?
Yes, by arrangement. Our team has worked shows across the country and internationally.
Do I need someone technical on my team?
No. Someone from your booth staff should join the walkthrough before doors open so they know where things are. That's the only time we need.
Will you work with our booth builder or agency?
Yes. Give us their contact and we'll coordinate power, cable routing, and timing with them directly.

Tell us about the show.

Estimates go out within one business day.